What are my lab requirements needed to install the test systems?

Accel-RF offers a complete lab planning guide, specific to each test system sold.

For general guidelines, please consult the following table:

Screen Shot 2019-05-14 at 5.54.08 PM

Additional requirements:

Electrical: (should have backup UPS or other preventive power loss protection)

120/208VAC 50A (dependent on DUT/SSPA ratings), 3-Phase, 5-Wire, Wye configurationor

230/400VAC 30A (dependent on DUT/SSPA ratings), 3-Phase, 5-Wire, Wye configuration

Step up Transformer (208/400VAC) with 20KVA load capacity.

TBD Plug and Receptacle (dependent on current rating)

Size:

22.5”W x 58”H x 36”D (single-bay)

46”W x 58”H x 36”D (dual-bay)

68”W x 58”H x 36”D (triple-bay)

Approximately 750lbs. (single-bay) / 1200lbs. (dual-bay) / 1500lbs. (triple-bay)

Chiller Size (if applicable):

22.5”W x 22”H x 42”D (est.)

Chilled Water (if applicable):

Chiller with 7,000W capacity capable of maintaining 12°C

Or

Facility water (filtered) with temperature of 12°C and 50psi pressure (nominal values)

Environmental:

Room Temperature should be +23oC +/- 5oC Humidity: standard room environmentArea: at least 1 meter clearance at back and front of system